Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding

Product Details
Customization: Available
After-sales Service: Online Technical Guidance
Warranty: 1
Still deciding? Get samples of US$ 15/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2022

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (8)
  • Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
  • Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
  • Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
  • Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
  • Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
  • Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Find Similar Products
  • Overview
  • Product Description
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Steel prop
Material
Steel
Type
Mobile
Structural Style
Multi-Pole Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Single Row Scaffolding
Erection Position
Internal Scaffolding
Move Method
Horizontal mobile Scaffolding
Scaffolding Part Type
Scaffolding Props
Construction Properties
Building Scaffold
Outer Tube Diameter
60mm
Length
2.2-4m
Surface Treatment
Hot DIP Galvanizing
Usage
Construction Usage
Inner Tube Diameter
48mm
Tube Thickness
1.8mm-3mm
Transport Package
Bundled + Pallets
Specification
48*60
Trademark
sanye
Origin
China
Production Capacity
20000pieces/Day

Packaging & Delivery

Package Size
250.00cm * 30.00cm * 30.00cm
Package Gross Weight
20.000kg

Product Description

SANYE Galvanized Metal Acrow Steel Props For Building Construction Shuttering Support Jacks Scaffolding Shoring

Product Description

The Steel Prop is a support device widely used for supporting the vertical direction structure, that adapts to the vertical support of the slab formwork of any shape. It is simple and flexible, and the installation is convenient, economical, and practical. The steel prop takes small space and is easy to store and transport.
Steel Prop are commonly used to support and strengthen buildings or other structures. They can be used to support heavy objects suspended from high places, such as cranes, Bridges, and pylons.
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
 
 
 
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
The production process of scaffolding steel prop is complex and cumbersome, including the following:

Inner tube: Cutting Tube→ Punching→ Welding Bottom Plate.

Outer tube: Cutting Tube→ Rolling Threaded Tube→ Punching Oval Hole→ Welding Threaded Tube→ Welding Bottom Plate.

Accessories: G pin→ Forged Pin→ Nuts (coated sand/precision casting)→ Handles.

Surface Treatment: Hot-dip galvanized.

Assembly→ Reaming→ Labeling→ Palletizing (steel tape) →Labeling→ Loading Container→ Make Inspection Photos→ Make Loading Photos.

 
Advantages of steel support:


1. The design of the steel support structure is reasonable and safe.

2, the actual installation and disassembly is convenient.

3, the actual operation is convenient, fast, practical, efficient, and safe.

4, the project cost is greatly reduced.

5, its wide range of applications.

6. Convenient transportation.



 
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
 
 The Type of scaffolding Prop
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding Middle East Type Prop
Adjustable Height
(mm)
Inner Tube OD
(mm)
Outer Tube OD
(mm)
Thickness
(mm)
Surface Treatment
1800-3200 48 60 1.8/2.0/2.2/2.5/3.0 Painted
Powder Coated
Electric galvanized
Hot Dip Galvanised
2000-3500 48 60 1.8/2.0/2.2/2.5/3.0
2200-4000 48 60 1.8/2.0/2.2/2.5/3.0
2800-5000 48 60 1.8/2.0/2.2/2.5/3.0
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding Italian Type Prop
Adjustable Height
(mm)
Inner Tube OD
(mm)
Outer Tube OD
(mm)
Thickness
(mm)
Surface Treatment
1600-2900 48 56 1.6/1.8/2.0/2.2 Painted
Powder Coated
Electric galvanized
Hot Dip Galvanised
1800-3200 48 56 1.6/1.8/2.0/2.2
2000-3600 48 56 1.6/1.8/2.0/2.2
2200-4000 48 56 1.6/1.8/2.0/2.2
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding Spanish Type Prop
Adjustable Height
(mm)
Inner Tube OD
(mm)
Outer Tube OD
(mm)
Thickness
(mm)
Surface Treatment
1600-2900 40 48 1.6/1.8/2.0/2.2 Painted
Powder Coated
Electric galvanized
Hot Dip Galvanised
1800-3200 40 48 1.6/1.8/2.0/2.2
2000-3500 40 48 1.6/1.8/2.0/2.2
2200-4000 40 48 1.6/1.8/2.0/2.2
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Props Manufacturing Steps
 
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Step 1, CUTTING

Steel pipes (both external and internal) are then cut to size with a +/-1 mm tolerance. Cutting is done using automatic cutting machines: a bundle of pipes is placed on the loader which selects one pipe at a time. It is then loaded on a positioning device and cut precisely at the desired height. Lastly, the pipe is unloaded into a container for the subsequent step.
 
Step 2, DRILLING

Then there follows the drilling step, which is carried out depending on the type of pipe. Due to the new technologies, the drilling is quick, precise, and burr-free.
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
 
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Step 3, WELDING

External pipes proceed to the welding step, where - suitably positioned - they are assembled with the base plate and the end is threaded. Once drilled, the internal pipes undergo the same welding process but concerning the plate only.
Step 4, COATING AND GALVANISING

Once welded, the props can be: dip coated, cold-dip galvanized (electrolytically), for a more durable protection with respect to dip coating and for better aesthetic quality, or hot dip galvanized for a basically permanent protection, suitable for all environments and withstanding external atmospheric agents.
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
 
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Step 5, FINISH

Depending on the product, next come the completion steps including mounting an outer sleeve on the covered threading or a forged steel ring nut.
 
Step 6, CUSTOMISATION

Customized products are available upon request: for example with a ring nut bearing the customer's colors, or the customization of the prop using stickers bearing the customer's logo.
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Step 7, PACKAGING AND SHIPMENT

Once with machining, we proceed to the packaging step. Packages usually come with 40 pieces, strapped. The material is then loaded into a truck or container and shipped.
 Our Services

1. Free Samples
2. The Delivery Time Is 15 Days, And The Customized Products Are 25 Days
3, Support Customized Product Packaging
4, Support Product ODM, OEM
5, Support Online Installation Technical Guidance
6. 24 Hours Online Response To Customers
7. One-Stop Service
 
 
 

Packaging & Shipping

 

Packing By Steel Strips, Packaging Can Be Customized According To Customer Requirements.
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding

 

Company Profile

Hebei SanThriving Company is a professional aluminum formwork accessories and construction fastener manufacturer in China. The factory is located in the Fastener Production Base Site---Yongnian area of Handan, The total area is 30.000 square meters. Since 2005 we established a factory until now, There are more than 200 employees in our factory and we have more than 15 years of production experience. We have advanced production equipment and a rich experience research development group. Our unique service is to supply Customised Products for our clients. The main products are Wedge pins, steel props, tie rods and tie nuts, flat wall ties, scaffolding, and aluminum formwork tools, These products are sold all over the world. The services of SanThriving company are Quality First and Service Supreme. We will continue to service our clients in the future. We are sincerely the client if you aren't satisfied please kindly tell us, if you are very satisfied with us then tell your friends and help more people to share our service and products.
 

Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding
Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding

FAQ

1. Who are we?
We are a professional aluminum formwork accessories and scaffolding accessories manufacturer in China.

2. How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

3. What can you buy from us?
Steel Prop, Pin And Wedge, Scaffolding, Thread Rod, Tie rod and nut, Base jack, and so on.

4. Why should you buy from us not from other suppliers?
Enterprise Advantage 1. Formwork accessories and scaffolding accessories manufacturer. 2. Supply customized products for your client. 3. We can help our clients to choose products, one-stop shoring to reduce client's purchase cost and time costs. 4. Strict Quality Control.

5. What services can we provide?
Accepted Delivery Terms: FOB, CFR, CIF, EXW, FCA, CPT, Express Delivery;
Accepted Payment Currency: USD, EUR, JPY, HKD, GBP, CNY, CHF;
Accepted Payment Type: T/T, L/C, D/P D/A, MoneyGram, Credit Card, PayPal, Western Union, Cash, Escrow;

Sanye 4m 3.5m Galvanized Shoring Post Formwork Steel Prop for Building Scaffolding

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now